Rationalize your purchases by choosing a single supplier Get a Free Quote
1082, Avenue Bobozo, 15 Eme Rue, Kingabwa Poids Lourds, Commune Limete, Kinshasa, R.D. Congo
Email us on info@isadrc.com
We are opened Mon-Frid from : 8h 00 - 17h 00 and Sat from : 8h 00 - 13h 00

Projects



service-image

Preventative Maintenance Monitoring of Open Gears

  • Client :TFM ISA Division
  • Lubricants Project duration : Monthly on-going
  • Key tasks completed : Supply Ceplattyn grease Mill inspections on both mills Inspections on vibrations and temperatures Monthly reporting
  • Key successes : TFM has not experienced any mill downtime No rise in temperatures on the Girth Gear and Pinion Gear.
  • service-image

    Underground Hoses

  • Client :KCC ISA Division
  • Project duration : 2015
  • Key tasks completed : Installed hose unit underground on level 345 and 505.24/7 operation and support.
  • Key successes : Reduce downtime by 1.5 hours per hose by being underground.
  • service-image

    Lab Testing

  • Client : Confidential
  • Industry : Machinery Supplier
  • ISA Division : Laboratory
  • Project duration : March 2015 ongoing
  • Key tasks completed : 24 hour turn around on oil testing and report, Circa 300 tests per month
  • Key successes : Increased service intervals by 100% fro 250 to 500 hours, 125 (samples) x $50 = $6,250, Return on investment: 125 engine oil test times avg of $3,000 per service = $375,000
  • service-image

    Firetrace KICO

  • Client : KICO SA “Ivanhoe Group”
  • ISA Division : DLP Automated Fire Suppression system
  • Project duration : 8-hour installation, quarterly maintenance
  • Key tasks completed : Installed Firetrace suppression system on Underground Ventilation Control Room MCC
  • Key successes : $500,000 MCC protected from fire damage 24/7 Automatic activated system immediately (3seconds activation tim
  • service-image

    Firetrace EGMF

  • Client : EGMF
  • ISA Division : ILP Automatic Fire Suppression
  • Project duration : 48 hour installation, quarterly maintenance
  • Key tasks completed : Installed Firetrace suppression system on CAT16 H Grader and TR45
  • Key successes : $100,000 machine protected from fire damage on recent engine short circuit Operator activated system immediately (3 seconds activation time)
  • service-image

    Firetrace Mashamba

  • Client : Mashamba Enterprises
  • ISA Division : ILP Automatic Fire Suppression system
  • Project duration : 8-hour installation, quarterly maintenance
  • Key tasks completed : Installed Firetrace suppression system on John Deere S670 Harvester
  • Key successes : $300,000 machine protected from fire damage Operator activated system immediately (3 seconds activation time)
  • service-image

    Firetrace Boss Mining

  • Client : Boss Mining “ERG Group”
  • ISA Division : DLP Automated Fire Suppression system
  • Project duration : 56 hour installation, quarterly maintenance
  • Key tasks completed : Installed Firetrace suppression system on Luita Substation MCC
  • Key successes : $500,000 MCC protected from fire damage 24/7 circuit Automatic activated system immediately (3 seconds activation time)
  • service-image

    Installation of Kidney Unit

  • Client : Frontier Mine
  • ISA Division : ILP Automatic Fire Suppression
  • Project duration : Hydraulics – Bosch Rexroth
  • Key tasks completed : Installed Hy-Pro VAC-U-DRY dehydrator
  • Key successes : Water removal: 100% free water and 90% dissolved water Air and gas removal: 100% free gas and 90%+ dissolved gas Particulate removal: ISA 14/12/9 – 2.5 micron
  • service-image

    Installation of ALS System

  • Client : Chemaf Mine
  • ISA Division : Automated Lubrication System
  • Project duration : 4 days
  • Key tasks completed : Installed ALS system
  • Key successes : Reduce maintenance time, Correct amounts of lubrication at the correct time (no wastages), Prevent contamination, Prevent cross contamination
  • service-image

    Automated lubrication Equipment

  • Client : Brasimba “Brasseries Simba S.A’’
  • ISA Division : Automated Lubrication systems
  • Project duration : 1 year contract
  • Key tasks completed : ALS installed, Colour tagging of Equipment, Lubrication technician onsite, Monthly reporting, Used oil disposal
  • Key successes : Reduce maintenance time, Correct amounts of lubrication No wastage, Prevent contamination, Prevent cross contamination
  • Media


    about us

    Work Experience

    Save time by taking full advantage of our 24/7 hour rapid delivery on selected products.

  • LUBRICANTS
  • OIL ANALYSIS LABORATORY
  • HYDRAULIC HOSES SYSTEMS
  • FILTERS
  • FIRE TRACE
  • ISA S.A.R.L

    We Provide you with the Highest Quality Work that Meets your Expectation.